Showing posts with label hydrogeology. Show all posts
Showing posts with label hydrogeology. Show all posts

Thursday, October 4, 2012

FUNDAMENTALS OF AQUIFER MAPPING



The water Resource Ministry of Government of India has released a notification and a fact sheet on National Aquifer Mapping Programme (NAQUIM). The Central Groundwater board and the State Groundwater Departments will act as the main functionaries in this programme. It is also decided by the government that national level aquifer mapping will progress substantially through the 11th five year plan period. Considering the fact that those government departments alone cannot accomplish the job it has been decided that stake holders and NGOs would be involved in this endeavor.  This national level programme also has components like nation wise training and human resource development.
But, what is an aquifer map and what it is for?
The concept of aquifer mapping is not new. Many developed countries like Australia and USA have already completed aquifer maps in certain areas like Murray Darling Basin and Texas. They have already published some of the reports and maps. An aquifer map is not a single map, on the other hand it is a group of several maps that would describe the aquifer system and management criteria and options in an area.
In NAQIM programme of India it has been proposed that aquifer maps would include (1) Identification of Aquifer Management Units (AMU) (2) Evaluation of AMU, (3) Data preparation and generation of different categories (4) Prioritization of AMU, (5) Preparation of aquifer management plans and aqifer management and information system, (6)  Participatory groundwater management.
1.      IDENTIFICATION OF AQUIFER MANAGEMENT UNITS:
Aquifer management units are something different from a Hydrogeological unit. In a hydrogeological map generally geological units are described by its hydrogeological characteristics. But an AMU contains much more than that. It includes the 3 dimensional matrix of all information like extent of the aquifer, depth, thickness, geology, hydrology, land use on it, recharge and discharge related information and its political and social boundaries.
2.      EVALUATION OF OF AMU:
This is the most difficult task. Aquifer evaluations are conducted for various purposes including water supply development as well as groundwater contamination and remediation situations. They can range from fairly intense evaluations involving test drilling, geophysical investigations, installation of monitoring or observation wells, test pumping, physical and chemical water quality analyses, analytical and digital modeling to rapid evaluations based on existing data.
3.      DATA PREPARATION AND GENERATION OF DIFFERENT CATEGORIES:
The groundwater departments and states are generating groundwater data on regular basis. But those data are generally categorized on the basis of revenue boundaries and not on the basis of aquifer boundaries. So under NAQIM aguifer related data should be compiled and generated. A suggestive list of required data is given below.

   - Evaluation of existing data
   - Test drilling
   - Installation of monitoring or observations wells
   - Geoprobing and/or hydro probing
   - Geophysical investigations
   - Geophysical borehole logging
   - Groundwater gauging
   - Groundwater sampling and analyses
   - Test pumping
   - Slug testing
   - Analytical and digital groundwater modeling
   - Solute transport modeling
   - Groundwater monitoring
4.      PRIORITISATION OF AMU:
AMUs are basically aquifers subdivided into management units. These units are prioritized according to the demand and usage depending on the evaluated parameters of the aquifer. Before prioritization a management framework is required. The framework may include:
• Establish the baseline groundwater conditions and range of natural variability in the aquifer to facilitate enhanced knowledge and detection of change.
• Provide a consistent approach to understanding potential effects from all development activities on the surrounding environment.
• Facilitate projections of change based on future scenarios, such as expanding development or climate variability and change.
• Support and supplement the current pollution prevention and risk management principles as part of groundwater quality and quantity management.
 Prioritisation index:
Depending on the hydrogeology, quality of water and development status a prioritization index is to be developed by the groundwater authorities.
AMUs are initially ranked according to an index (equation 1) based on normalised current groundwater extraction, the fraction of groundwater allocation currently extracted , the fraction of sustainable yield currently extracted , a potential growth index and an index of the predicted future impact of groundwater extraction on surface water flow.
Apriority evaluation index has been attempted in Murray-Darling Basin Sustainable Yields Project (http://www.clw.csiro.au/publications/waterforahealthycountry/mdbsy/technical/Q-GMU-Prioritisation.pdf) Several other algorithms can be developed to prioritise aquifers in our country. In a GIS platform both raster and vector based analysis may lead to an efficient decision support system.
5.      MANAGEMENT PLAN
This initiative will seek to protect the long term water supply capacity of the aquifer by controlling average annual aquifer use and balancing it with average annual recharge.
                                i.            Aquifer Protection Plan: This initiative will seek to assess the quality of the water in the aquifer and then to protect it by encouraging activities that enhance water quality and by discouraging activities that degrade it.  The key components are
                              ii.            Maintain Status Quo where water level is alarmingly depleted.
                            iii.            Reduce withdrawal of water: Water withdrawal may be reduced by introducing innovative farming, recycling of water and reducing consumption. The management plan will address aquifer specific recommendation.
                            iv.            Enhance Natural Recharge: To enhance natural recharge proper steps should be taken. This may include afforestation, gully plugging, construction of sub surface dykes etc. This initiative will seek to maximize aquifer recharge with good quality water by encouraging beneficial land and water management practices and by investigating the potential to use stream flow.
                              v.            Monitoring plan: This initiative will seek to maintain a current and comprehensive scientific database on the aquifer by collecting, compiling and evaluating data. The current aquifer monitoring activities could be reviewed to coordinate and redesign them, focusing on the comprehensive protection of the Aquifer.
                            vi.            Manage Pollution Risks: Activities carried out in pits and dumping areas within the primary recharge area present a variety of risks to aquifer water quality. The risks associated with these activities could be assessed and, where required, action taken to manage them as part of an aquifer protection plan. Other risks like geogenic contamination like As and Fl should be properly addressed in the management plan to reduce public health hazards.
                                      vii. Reduce Incoming Salt Water: The regional salt water flow to the aquifer could possibly be intercepted by installing a set of management structures or through innovative engineering activities.

6.      AQUIFER EDUCATION PLAN
The potential long term success of this management plan depends on the understanding and cooperation of a diverse group of people.  It is believed that a better informed group makes better decisions.  Only common understanding will engender the cooperation needed to formulate,  implement and maintain a successful long term stewardship plan for the Aquifer. Additional study is required to achieve a better understanding.  Extension education is required to make knowledge gained available to all area residents.

Wednesday, September 26, 2012

Sustainable groundwater management – Report of the Working Group of the Planning Commission for the 12th Five Year Plan


Submitted by Amita Bhaduri on January 6, 2012 - 16:27

This is the report on “Sustainable Groundwater Management” by the Working Group set up by the Planning Commission as a part of the process to prepare the 12th Five Year Plan. The existing methodology of groundwater resources assessment is appropriate and suitable for country-wide groundwater resources estimation, considering the present status of database available with the Central and State agencies.
However, the following corrective or additional measures are suggested -
  • Alternative techniques of recharge estimation should be taken up in areas where assessments derived through GEC do not match with the field situations.
  • Micro-watershed (hard rock areas) and doab (alluvial areas) - wise assessment based on actual field estimation of recharge and discharge parameters (GEC-1997) to be taken up in few identified areas.
  • Utilize regional scale assessment methods like space-based measurements for validation.
  • All data elements need strengthening and refinements through R&D support in the form of project based studies (regional and local scales) and should be dovetailed with the County’s Ground Water Resource Assessment. For instance, studies on estimation of baseflow, recharge from streams, inflow-outflow across assessment boundary to be taken up on pilot basis in select areas.
  • Continuous strengthening of database managed by the Central/ State Governments for groundwater resources estimation is required. Benchmarking of the data elements needs to be established in this regard.
  • To develop prognostic models of resource estimates in changing climate.
  • There must be a convergence of assessment of ground water in terms of quantity and quality, for accurate estimation.
  • Groundwater resources assessment should be an iterative process involving evaluation and refinement by incorporating new techniques and giving due consideration to climate change.
  • Aquifers are the repositories of ground water resources, hence aquifer mapping has been given due consideration for sustainable management of ground water in the 12th plan. Toposheets will be the base while initiating the mapping of aquifers. Aquifer mapping at the scale of 1:50000 should be initiated. Such mapping can be taken up at appropriate scales (higher or lower) as per specific requirements. Aquifer mapping shall be taken up as part of the 12th Plan as a co-ordinated effort. Led by CGWB and in close co-ordination with other organisations including research institutes and civil society organisations, aquifer mapping must lead to comprehensive groundwater management plans.
  • Comprehensive plan for participatory groundwater management based on the understanding and outcome of aquifer mapping shall be taken up. Stakeholders should be motivated through appropriate mechanisms by exploring the possibility of a dedicated programme on groundwater or implementation through other appropriate programmes.
  • Creation of state-level institutions to manage groundwater is suggested. There will be a parity of design and mandate in the development of such State level institutions, based on existing good practice. The working group also suggests creation of a network of institutions to facilitate the process of groundwater management. Strengthening the mandate and design of institutions dealing with groundwater to enable them to perform their roles is strongly recommended. Such strengthening will also draw from the fields of participatory management of resource, social science and economics.
  • Strengthening of ground water monitoring network by increasing density and frequency of monitoring points for ground water level and water quality is recommended. A combination of participatory measurement as well as automation shall be taken up during such strengthening. Strengthening of institutions dealing with groundwater in terms of manpower/professionals and design is recommended to enable them to perform their roles.
  • The technological advancements being utilized worldwide should be introduced in CGWB to upgrade the institutional, infrastructural and human resource capabilities and bring CGWB to an international level, with best possible techniques and technologies for better management of ground water resources in the country.
  • It is suggested that Planning Commission constitute a system at the apex level to bring coherence among different ministries dealing with groundwater, in an attempt to ensure improved groundwater management and governance. 

Saturday, June 2, 2012

Hydrogeology of Rajarhat New Town


Geology
The project area and its surrounding parts are underlain by huge thickness of quaternary sediments laid down by the southerly flowing Bhagirathi river and its tributaries. The major area is occupied by recent alluvium comprising of gray sticky clay, fine and medium sand mainly. At a depth of 120 metre or more there is a brown clay horizon of sub recent age. Average thickness of the clay layer near to the surface is about 25 metres.
Hydrogeology:
Groundwater occurs in several granular zones deposited by the river system. Sand horizons of different grades textures and colours constitute the main aquifers. In Rajarhat area due to the presence of thick clay at the top the upper aquifer gives a semi confined character. The drilling data available from the tube well drilled at Ecospace, Bengal Ambuja Complex shows that there is a thick gray clay bed upto a depth of 10 metres. From 10 to 42 metres there are several layers of fine sand often mixed with clay. This is the upper low yielding aquifer of the area. Below this there is a dark gray clay bed between 42 metre and 55 metres.  From 55 metres to 84 metres there is a bed of fine sand. Below this medium sand occurs  upto a depth of 100 metres (16m thickness). Below this upto a depth of  135metres there is fine sand.
The litho log and assembly is given in plate I
The zone between 55 metre and 135 metre constitutes a potential aquifer in this area and most of the groundwater is withdrawn from this area.
GROUNDWATER LEVEL
Groundwater level in Rajarhat block is regularly monitored. The post monsoon Groundwater level (2011) of 7 monitoring stations in and around the project area is given in the table1. With the help of the data a depth to water level zonation map is prepared which is shown in plate II.

Table 1. Post Monsoon depth to water level of Rajarhat area. (Source: SWID)
Sl NoMouza
Location
Type of well
Post monsoon DWL mbgl
1              Patharghata      
Village centre
Tube well
5.5
2              Chandpur           
Panchayet office
Tube well
0.85
3              Gopalpur            
Health Centre
Tube well
11.25
4              Rajarhat              
Bishnupur Health Adm unit
Tube well
5.53
5              Ghuni   
Primary School
Tube well
9.9
6              Jagadishpur       
Primary School
Tube well
7.7
7              Sukantanagar Salt Lake 
Near Club
Tube well
12.3


It appears that the post monsoon depth to water level of the project area is between 8 to 9 metres below ground level. Water level is also collected from a deep tube well of the Tinkanya project site. The depth to water level of that well on25 January 2012 is 8.29 mbgl. The tube well tapped the aquifer between the depth 80m bgl to 95 m bgl.

Wednesday, March 30, 2011

PRESENT GROUNDWATER SCENARIO OF WEST BENGAL

Introduction
Introduction
Groundwater is prime natural resources in the earth .Not only it supported almost all types of life form to evolve, but also helped in growth of human civilization. It quenches thirst and meets the household demands. Used in the fields for production of food grains .Lastly the industries catering to the various needs and luxuries of human being have started consuming voluminous quantity of Water .Groundwater is therefore a precious national asset and planning, development and Management of water resources need to be governed by national perspectives.
In the beginning, water from rainfall and snow and rivers were only source of water to mankind. As these surface water sources were dependent on rainfall, localized shortage was often witnessed. With primitive technologies men was not able to build sustainable water reservoir to see them through the drought period .But once man came to know of groundwater, his dependence on it increased with the advent of civilization. At present about two billion people in the world is dependent on groundwater. Fortunately, groundwater is a renewable resource that is recharged every year through rainfall. However, this recharging process is not entirely dependent on rainfall but on various other natural factors that differ from region to region and within space and time. Therefore, recharge of groundwater is never a constant factor .When the average quantity of draft exceeds recharge for repeated years we face the situation of over exploitation.
The manner and the scale in which the use of groundwater has accelerated, human being has become so much dependent on the assured source that no sign of the over increasing demand for groundwater stabilizing.
Beginning of 20th century witnessed demand for groundwater in industrial sector rising phenomenally at a faster rate than that in agriculture and domestic sector.
West Bengal is the only state in India that stretches from Mountain to the Sea and truly a “Asamudra himachalam” state as the meaning goes. West Bengal has a very good groundwater potential. The reason of such affluence is due to her geographical location, high rainfall and favorable geological setting .The state have land area of about 2.7% but have about 6% of total replenishible groundwater resources of India. Groundwater is the most exploited resource in west Bengal particularly in agriculture sector With the introduction of water intensive high yielding variety , the need for groundwater have skyrocketed. Quinquennial census of minor irrigation structures indicated a 64% growth in number of STWs over last 16 years,@4% annually.
Table Showing Number of Groundwater Structures from 1986 to 2001

Name of Structure 1986-87 1994-95 2000-2001
Dug Well 63387 55983 39377
Shallow Tubewell 368316 504638 603667
Deep Tubewell 3122 4039 5139

Hydrogeological Condition
Geologically West Bengal can be divided into two broad units (A) Consolidated or semi consolidated formation occurring in the northern most and western part of West Bengal and (B) Unconsolidated formation in the rest of West Bengal.
(A) Consolidated/ semi consolidated formations:
These formations cover the western and the northern part of the state. These are comprised of Archaean crystalline rocks and Gondwana group of rocks including Rajmahal traps covering part of Purulia, Bankura Paschim Medinipur, Birbhum and Burdwan.. Archaean metamorphics, Siwalik and Gondwana covers part of Darjeeling and Jalpaiguri District. In the western part and in some part of Darjeeling district , these hard and semi consolidated rocks are overlain by weathered residuum and laterite capping.
(B) Unconsolidated formations:
These formations belonging to the Tertiary and Quaternary age and covering rest of West Bengal. These formations may be subdivided into (a) Secondary laterite (b) Older alluvium and (c) Recent alluvium.

Secondary laterite occurs at the marginal area between the Consolidated/ semi-consolidated rock and older alluvium mainly in the districts of Bankura, Paschim Medinipur, Burdwan and Birbhum. Older alluvium occurs mainly in the elevated terraces fringing the lateritic margin of the Chhotonagpur plateau in Bankura, Pascim Medinipur, Burdwan, Birbhum, Hoogli and Murshidabad district and in the Barind region of North Bengal. Recent sediments occupy the river courses and flood plains.


Depletion of groundwater
In spite of having high groundwater reserve, exploitation of the resources in West Bengal shot up to such level that 80’s decade first witnessed the sign of depletion of groundwater level in some blocks of Murshidabad, Burdwan, Medinipur, Hoogly where pre-monsoon water level dropped below the centrifugal pumping limit and hand tubewells went dry. Introduction of Submersible motor driven pump though came as a blessing to the cultivators, for it can draw water from far deeper depth – caused further lowering of groundwater level.
Depth to water level data analyzed by the State Water Investigation Directorate, Govt. of W. Bengal, indicated significant average annual fall in pre monsoon depth to water level during the period 1995 to 2004 to the tune of 16 to 70 centimeters in some blocks of Murshidabad, Burdwan, Purba Medinipur and Hoogly districts. In some parts of Hooghly, Burdwan and Murshidabad districts, significant fall was noticed in both pre and post monsoon period.

Case 1 No change


Case 2- Post monsoon no change but pre monsoon falling trend


Case 3 both pre & post monsoon show falling trend


Case 4: Pre monsoon rising trend, post monsoon falling.


Groundwater Quality
In addition to the phenomenon of lowering of water level, deterioration in Chemical quality of groundwater was noticed in some parts of the state that took place in the form of Arsenic and Fluoride contamination. On the basis of preliminary survey 81 blocks in the state have been identified where Arsenic was found in groundwater above permissible limit. Similarly, presence of Fluoride beyond permissible limit in groundwater was detected in 49 blocks of the State.
It was observed that the entire younger and recent alluvium formation east of Bhagirathi River is arsenic bearing and reason for such occurrence is solely Geogenic. Arsenic held by the solid phases within the sediments, especially iron oxides, organic matter and sulphides might constitute the primary arsenic sources in groundwater under condition condusive to arsenic release from solid phases.
Occurrence of Fluoride, in groundwater is generally recorded from hard rock areas. The subsurface water may be contaminated with dissolved substance due to disintegration and dissolution of bed rock that rendered water unfit for drinking due to presence of certain toxic constituents. Fluoride is one such chronic toxic substance, that have affected large number of people causing Skeletal or Dental fluorosis. Fluorite (CaF2), Cryolite (Na Al F6) is the rock forming minerals which contribute Fluoride to the groundwater. Wastewater containing Fluoride originating from various industries viz phosphate fertilizer, ceramic industry brick kiln and pharmaceutical industries may find its way to the groundwater and elevate the Fluoride level.

Assessment of Groundwater Resources
Apprehending phenomenal increase in extraction of Groundwater, Government of India considered that quantitative assessment of these resources is necessary for planning and sustainable development. Accordingly , Ministry of water Resources formed Groundwater Estimation Committee , which came out with a methodology based on reasonably valid scientific principles and reliable data .The first assessment of the resources was carried out in 1984. Meanwhile, Central Groundwater Board and different State Water investigation Organizations carried out further detailed studies and generated additional database which along with the ever-rising Groundwater utilization through the country, indicated need for modifying the methodology for more precise assessment. Another Estimation Committee was set up in 1995 came out with modified methodology in 1997 known as GEC ’97 methodology. Assessment of Groundwater resources of all the States were carried out jointly by the Central Groundwater Board and the respective State groundwater Organizations with block as unit and 2004 as base year.
The assessment revealed that the national average for stage of groundwater development is 58% whereas the same for the State of West Bengal is 42%.The assessed blocks were categorized, on the basis of stage of development and long term significant decline of groundwater level, as ‘Safe’, ‘Semi-Critical’, ‘Critical’ and ‘Over exploited’ .In the national scenario, 4078 blocks are Safe out of total 5723 blocks.
In West Bengal assessment was carried out in 269 blocks out of total 341 blocks leaving aside 13 hilly blocks in the north and 59 Saline blocks of coastal region. As per the assessment carried out by application of GEC’97 methodology, 231 blocks have been found to be Safe .28 blocks were assessed to be Semi-Critical and 10 blocks as Critical. However State committee on groundwater assessment is reviewing assessment and categorization of this 10block.
Based on the assessment carried out the net groundwater availability in West Bengal was calculated to be 27.46 BCM, whereas existing groundwater draft in all sectors –irrigation , domestic and industrial , is 11.65 BCM, leaving 15.81 BCM of dynamic resources reserve for further use.
Planned approach for Groundwater development
The groundwater scenario at national level and that of West Bengal reveal that exploitation of groundwater in the state has not yet reached alarming critical stage .The national water policy 2002 states that exploitation of groundwater should be limited to the extent of annual recharge. Although the average stage of groundwater development is 42% in the state , adverse effects like water level depletion and chemical degradation have been noticed in some areas in scattered manner. Government is concerned about incidents of suffering of the local population in such areas due to shortage of water in peak summer and from diseases due to consumption of arsenic and fluoride contaminated water.
It was apprehended that if indiscriminate use of water go on unabated, adverse effects of degrading hydrogeological regime of the state, will amplify and will engulf the whole state in such a manner that the whole agriculture and industrial development process will suffer a set back. The Government had determined view not to allow such situation and decided to promulgate suitable Act to control and regulate the use of groundwater in the State.

Groundwater Act
West Bengal Groundwater Resources (Management , Control & Regulation ) Act 2005 was promulgated with effect from 15th September ‘2005.This act stipulates obtaining mandatory permit for installation of groundwater extraction structures operated by engine or motor driven pump .This act also , stipulate registration of all such structures existed before the act came into force.
Apart from West Bengal, other states viz. Himachal Pradesh, Kerala, Goa and Tamil Nadu have already passed suitable acts for control and regulation of groundwater .Andra Pradesh had enacted Water , land and tree act in 2002. Maharashtra enacted groundwater (regulation for drinking water sources) Act in 1993 for limited purpose of regulating public drinking water. For the remaining states either the groundwater bill is under drafting or draft bill is under consideration of the respective government.

Conclusion
Crisis of Water is probably the worst curse any civilization would like to face. It will be tragic for the next generation facing this crisis due to lack of foresight in part of the present generation. The groundwater resources, although renewable, are limited and vulnerable. Crisis of water may not be only quantitative; quality degradation may also add a different dimension to the problem.

West Bengal, which is considered to have tremendous groundwater potentialities, is no exception. Crunch is already felt in drinking water sector in rural west Bengal during Boro cultivation season precipitating a situation of artificial draught in almost every year. Unpredictable monsoons, destruction of green coverage, siltation of rivers, uncontrolled urbanization have compounded this problem. Area under arsenic and fluoride are increasing day by day. Failures in part of the authority to implement the Groundwater Act and lack of awareness in part of the users have failed to check unrestricted growth of tubewells in the state. Stages of groundwater development with 2004 as base year that show a meager 42% stages of groundwater development in the state as against a national average of 58% , needs to be upgraded .The 4th Minor Irrigation Census is presently underway and results might reflect a higher Stages of groundwater development for this state. The act for controlling extraction of groundwater is probably not adequate in itself for total management of groundwater resources unless people is made to aware about the adverse situation which may arise from unplanned and indiscriminate use of groundwater. The other strategies involve co-ordinate approach to conservation, augmentation and conjunctive use of groundwater, wherever possible. This can be successfully achieved through rain water harvesting and artificial recharge that make it possible to:
1. Restore supply in aquifer, depleted due to overexploitation.
2. Improve chemical quality
3. Prevent salinity ingress.
4. Increase hydrostatic pressure against land subsidence

To implement rain water harvesting and artificial recharge to be implemented , it is necessary to adopt policy decisions like mandatory installation of roof top rain water harvesting and artificial recharge structures in urban areas and restoration of all derelict tanks in the villages , building check dams etc in high slope areas.
Groundwater is not an isolated resource. It is a phenomenon within the hydrological cycle. So depending on the hydrogeological condition, water level condition and stage of development proper measure for augmentation of groundwater should be taken.


Thursday, September 24, 2009

WATER CRISIS IN PURULIA


WAter crisis in Purulia district is not new. Every year some parts of this district face severe water crisis during the summer. But whenever drought or similar situation arrives the development authorities oft for sinking tubewells in the affected area. But while sinking such tube wells attention should be given to the hydrogeological condition of the district. This district is mainly a granitic terrain consisting of crystalline basement rocks thinly covered with weathered mantle. There is a shallow fracture zone. This thin porous medium can not store sufficient quantity of groundwater. So most of the tube wells fail to yield water for a long time. It is always wise to opt for harnessing rainwater on the surface. Here is a high resolution hydrogeological map of Purulia.